Utilities - Proposed

Roadworks | York Road

Address:
The Tower Building, 11 York Rd, South Bank, London SE1 7NX, UK

Start date:
01/03/2018

Completion date:
14/03/2018

Update:

Between the 1st March and the 14th March 2018, GTC pipelines will be undertaking excavation work on York Road. These works will cause some carriageway and footway incursion at the junction with Station Approach

Roadworks | Albert Embankment

Address:
Albert Embankment, London, UK

Start date:
28/02/2018

Completion date:
02/03/2018

Update:

From the 28th February to the 2nd March Albert Embankment will have a lane closure in place whilst Thames water undertake work.

Roadworks | Cornwall Road

Address:
20 Cornwall Rd, South Bank, London SE1 8YF, UK

Start date:
27/02/2018

Completion date:
12/03/2018

Update:

From the 27th February to the 12th March GTC Pipelines will be undertaking works on Cornwall Road at the junction with Brad Street. This will result in some carriageway and footway incursion.

Roadworks | Westminster Bridge Road

Address:
123 Westminster Bridge Road, London, UK

Start date:
10/04/2018

Completion date:
12/04/2018

Update:

There will be a lane closure on Westminster Bridge Road from the 10th to the 12th April 2018, whilst Cadent Gas Limited excavate to disconnect a line in order to comply with gas safety regulations 1994.

Road Closure | Upper Ground

Address:
99 Upper Ground, Lambeth, London SE1 9PP, UK

Start date:
05/02/2018

Completion date:
23/02/2018

Update:

From the 5th to the 23rd March, a road closure will be in effect on Upper Ground between a point 10 metres east of the junction with Cornwall Road and Waterloo Bridge, whilst Lambeth Council undertake carriageway resurfacing works.

Road Closure | Albert Embankment

Address:

Start date:
05/03/2018

Completion date:
15/03/2018

Update:

From the 5th to the 15 March, a road closure will be in place on Albert Embankment, from the junction with Black Prince Road, to the junction with Salamanca Street whilst Thames Water undertake work.  They will be drilling two trial holes in the footway and carriageway to locate the position and level of existing utilities present. The trial holes will be located outside no. 10 and at the junction of Black Prince Road.

Utilities Work | Upper Ground

Address:
Upper Ground, London, UK

Start date:
04/03/2018

Completion date:
04/03/2018

Update:

On the 4th of March, UKPN will be carrying out works on the pavement of Upper Ground. This will create no carriageway incursion

Roadworks | Westminster Bridge Road

Address:
170 Westminster Bridge Rd, Lambeth, London SE1 7RW, UK

Start date:
26/02/2018

Completion date:
27/02/2018

Update:

On the 26th and 27th February, London Transport will be undertaking works to remove a 3 bay non advert bus shelter for and on behalf of TFL on Westminster Bridge Road, opposite The Walrus public House. 11.4m west of Lower Marsh, resulting in some carriageway incursion.