Stamford Street | Bus Shelter Works

Address:

Start date:
12/10/2015

Completion date:
14/10/2015

Update:

Transport for London will be removing the existing bus shelter and building a new one on Stamford Street.

A Stop and Go, 3.25m running lane will be in operations.  Delays likely.

 

Stamford Street | Pavement Works

Address:
Rennie Street, London, United Kingdom

Start date:
07/09/2015

Completion date:
20/10/2015

Update:

Transport for London are carrying our hard Landscaping on the footway, east bound at the junction with Rennie Street.  Width Restriction with  3.25 Running Lane.

Closure of Stamford Street Slip Road from Blackfriars Road

Address:
1 Blackfriars Road, London SE1 8NY, UK

Start date:
03/08/2015

Completion date:
07/09/2015

Update:

Transport for London will be carrying out works for the permanent closure of Stanford Street slip road and pedestrian foot way.  Also includes realignment works for carriage way on Stamford Street at the junction with Southwark Street and Blackfriars Road, including

  • 3.0 metre wide vehicular flare on the nearside lane.
  • One 4.0 metre wide vehicular lane, from junction with Southwark Street & Blackfriars Road (West bound)
  • 1.3m metre wide kerbed signal island.
  • Advanced stop line at the junction with  Southwark Street and Blackfriars Road.
  • 2.0m wide pedestrian footway along the North bound edge of Stamford Street, between Rennie Street and Blackfriars Rd to replace the foot path along the North bound side of the slip road, lane 1 of 2 closed with 3.25 metre running lane.

Stamford Street | Paving Works

Address:
27-45 Stamford Street, London SE1, UK

Start date:
10/08/2015

Completion date:
26/10/2015

Update:

Transport for the London are carrying out hard landscaping works on Stamford Street,  westbound between Rennie Street and Hatfields.

1.2 meters of foot path is available for pedestrian access.

York Road | Partial Footpath and Lane Closure

Address:
59-61 York Road, London, United Kingdom

Start date:
13/08/2015

Completion date:
14/08/2015

Update:

Maintenance works outside 59 – 61 York Road.  There will be partial footpath closure and partial closure of lane 1 (West Bound).

York Road | Lane Closure

Address:
41 York Road, Lambeth, London SE1, UK

Start date:
13/08/2015

Completion date:
14/08/2015

Update:

Maintenance works will be carried out opposite 41 York Road to repair drains. There will be partial footpath closures,  and partial lane closure of lane 1 (East bound).

 

 

York Road | Footway incursion

Address:
57 York Road, Lambeth, London SE1 7NJ, UK

Start date:
07/08/2015

Completion date:
11/08/2015

Update:

BT will be carrying out works on the foot path on York Road near the junction with Leake Street, to replace 1 jointbox frame and cover.  No carriage way incursion.

York Road | Installation of Foundations

Address:
Concert Hall Approach, Lambeth, London SE1, UK

Start date:
04/08/2015

Completion date:
06/08/2015

Update:

Transport for London will be installing foundations on York Road,  at the the junction of Concert Hall Approach.  This is in preparation for the installation of the Legible London signage.

There is no carriage way incursion.