Utilities - In Progress
Traffic Signals | Upper Ground
Address:
South Bank Tower, London SE1, UK
Start date:
11/01/2017
Completion date:
13/01/2017
Update:
Gas Transportation Co Ltd are excavating trial holes along Upper Ground outside of 73 Upper Ground. There will be two-way signals to manage traffic.
Traffic Signals | Upper Ground
Address:
97D Upper Ground, Lambeth, London SE1 9PR, UK
Start date:
06/01/2017
Completion date:
10/01/2017
Update:
Gas Transportation Co Ltd are excavating trial holes along Upper Ground at the junction of Cornwall Road. There will be two-way signals to manage traffic.
Traffic signals | Upper Ground
Address:
99 Upper Ground, Lambeth, London SE1 9PP, UK
Start date:
03/01/2017
Completion date:
05/01/2017
Update:
Gas Transportation Co Ltd are excavating trial holes along Upper Ground opposite the Green Room. There will be two-way signals to manage traffic.
Power network repairs | Doon Street
Address:
3 Cornwall Rd, Lambeth, London SE1, UK
Start date:
24/11/2016
Completion date:
30/11/2016
Update:
Lambeth are replacing a link box as part of urgent maintenance work. There is some carriageway incursion.
Thames Water maintenance | Waterloo Road
Address:
133 Waterloo Rd, Lambeth, London SE1, UK
Start date:
07/12/2016
Completion date:
09/12/2016
Update:
Thames Water are performing repair works to a chamber cover on the carriageway. There will be some carriageway incursion
Hoarding Licence | Westminster Bridge Road
Address:
170 Westminster Bridge Rd, Lambeth, London SE1 7RW, UK
Start date:
18/06/2016
Completion date:
17/09/2016
Update:
Lambeth have renewed a hoarding licence on Westminster Bridge Road / Upper Marsh.
Waterloo Station Shell Entrance Closure
Address:
Waterloo Station York Road (Stop V), London, United Kingdom
Start date:
15/11/2015
Completion date:
31/08/2018
Update:
On 15 November 2015, Waterloo Shell ticket hall, on York Road, will close until Summer 2018, as part of the works required for the wider development of Southbank Place .
During construction Transport for London are taking the opportunity to make improvements to the entrance and adjoining ticket hall. These include the addition of a third escalator, additional ticketing facilities, new ATMs and retail units, and a new, permanent art installation.
Whilst the work is taking place, customers will be directed to the two remaining ticket halls – the Colonnade ticket hall on Waterloo Road, and the mainline ticket hall which is connected with the National Rail concourse. From next week TfL will release a range of communications to ensure that customers are aware of these works, and how this may impact their travel.
Stamford Street | Carriageway Realignment Works
Address:
3-7 Stamford St, London SE1 9NY, UK
Start date:
01/09/2015
Completion date:
30/11/2015
Update:
Transport for London conducting re-alignment works of the carriageway on Stamford St at junction with Southwark Street and Blackfriars Road.
- At junction with Southwark St and Blackfriars Rd, 3m wide vehicular flare on the nearside lane.
- One 4.0m wide vehicular lane, from junction with Southwark Street and Blackfriars Road (West Bound).
- A 1.3m metre wide kerbed signal island.
- Advanced stop line on the junction with Southwark Street and Blackfriars Road.
- 2.0m wide pedestrian footway along the north bound edge of Stamford St, between Rennie Street and Blackfriars Roadd to replace the footway along the northbound side of the slip road.
- Lane 1 of 2 closed, 3.25m running lane.