Utilities - In Progress

Traffic Signals | Upper Ground

Address:
South Bank Tower, London SE1, UK

Start date:
11/01/2017

Completion date:
13/01/2017

Update:

Gas Transportation Co Ltd are excavating trial holes along Upper Ground outside of 73 Upper Ground. There will be two-way signals to manage traffic.

Traffic Signals | Upper Ground

Address:
97D Upper Ground, Lambeth, London SE1 9PR, UK

Start date:
06/01/2017

Completion date:
10/01/2017

Update:

Gas Transportation Co Ltd are excavating trial holes along Upper Ground at the junction of Cornwall Road. There will be two-way signals to manage traffic.

Traffic signals | Upper Ground

Address:
99 Upper Ground, Lambeth, London SE1 9PP, UK

Start date:
03/01/2017

Completion date:
05/01/2017

Update:

Gas Transportation Co Ltd are excavating trial holes along Upper Ground opposite the Green Room. There will be two-way signals to manage traffic.

Power network repairs | Doon Street

Address:
3 Cornwall Rd, Lambeth, London SE1, UK

Start date:
24/11/2016

Completion date:
30/11/2016

Update:

Lambeth are replacing a link box as part of urgent maintenance work. There is some carriageway incursion.

Thames Water maintenance | Waterloo Road

Address:
133 Waterloo Rd, Lambeth, London SE1, UK

Start date:
07/12/2016

Completion date:
09/12/2016

Update:

Thames Water are performing repair works to a chamber cover on the carriageway. There will be some carriageway incursion

Hoarding Licence | Westminster Bridge Road

Address:
170 Westminster Bridge Rd, Lambeth, London SE1 7RW, UK

Start date:
18/06/2016

Completion date:
17/09/2016

Update:

Lambeth have renewed a hoarding licence on Westminster Bridge Road / Upper Marsh.

Waterloo Station Shell Entrance Closure

Address:
Waterloo Station York Road (Stop V), London, United Kingdom

Start date:
15/11/2015

Completion date:
31/08/2018

Update:

On  15 November 2015, Waterloo Shell ticket hall, on York Road, will close  until Summer 2018, as part of the works required for the wider development of Southbank Place .

During construction Transport for London are taking the opportunity to make improvements to the entrance and adjoining ticket hall. These include the addition of a third escalator, additional ticketing facilities, new ATMs and retail units, and a new, permanent art installation.

Whilst the work is taking place, customers will be directed to the two remaining ticket halls – the Colonnade ticket hall on Waterloo Road, and the mainline ticket hall which is connected with the National Rail concourse.  From next week TfL will release a range of communications to ensure that customers are aware of these works, and how this may impact their travel.

Stamford Street | Carriageway Realignment Works

Address:
3-7 Stamford St, London SE1 9NY, UK

Start date:
01/09/2015

Completion date:
30/11/2015

Update:

Transport for London conducting re-alignment works of the carriageway on Stamford St at junction with Southwark Street and Blackfriars Road.

  • At junction with Southwark St and Blackfriars Rd, 3m wide vehicular flare on the nearside lane.
  • One 4.0m wide vehicular lane, from junction with Southwark Street and Blackfriars Road (West Bound).
  • A 1.3m metre wide kerbed signal island.
  • Advanced stop line on the junction with Southwark Street and Blackfriars Road.
  • 2.0m wide pedestrian  footway along the north bound edge of Stamford St, between Rennie Street and Blackfriars Roadd to replace the footway along the northbound side of the slip road.
  • Lane 1 of 2 closed, 3.25m running lane.