Utilities - In Progress

Roadworks | Belvedere Road

Address:

Start date:
05/03/2018

Completion date:
16/03/2018

Update:

From the 5th to the 16th of March, there will be two way signals in place on Belvedere Road at the junction with Concert Hall Approach whilst GTC Pipelines Ltd carry out works.

Roadworks | Albert Embankment

Address:
93 Albert Embankment, Lambeth, London SE1 7TY, UK

Start date:
05/03/2018

Completion date:
07/03/2018

Update:

From the 5th to the 7th of March, there will be a lane closure on Albert Embankment whilst Verizon carry out excavation works, at the section opposite Glasshouse Walk.

Footway Works | Waterloo Road

Address:
Doreen Ramsey Court, 108 The Cut, South Bank, London SE1 8LN, UK

Start date:
28/02/2018

Completion date:
01/03/2018

Update:

Between the 28th February 2018 and the 1st March 2018, BT will be undertaking works on the footway of Waterloo Road, at the junction with The Cut to correct defective concrete slabs. There will be no carriageway incursion as a result of these works.

Roadworks | Leake Street

Address:
Leake Street, London, UK

Start date:
26/02/2018

Completion date:
09/03/2018

Update:

From the 26th February to the 9th March, there will be roadworks on Leake Street, which will start on the 26th February 2018, and continue until the 9th March 2018 with some carriageway incursion.

Roadworks | London Road / St Georges Roundabout

Address:
212 London Rd, London SE1, UK

Start date:
28/01/2018

Completion date:
15/02/2018

Update:

From the 28th January – 16th February Thames Water will be undertaking emergency works to unblock a main sewer at the junction of London Road and St Georges Roundabout, near Lambeth Road. This will result in a bus lane closure, in place from 22:00 – 05:00 am between these dates.

Road Closure | Albert Embankment

Address:
10 Albert Embankment, London, United Kingdom

Start date:
05/03/2018

Completion date:
15/03/2018

Update:

From the 5th to the 15th March 2018 the section of Albert Embankment from Black Prince Road to Salamanca Street will be closed whilst Thames Water undertake work. They will be creating trial holes in the footway and carriageway to locate the position and level of existing utilities present. The trial holes to be located outside no. 10 Albert Embankment & at the junction of Black Prince Road.

Footway Closure | Upper Ground

Address:
Upper Ground, London, United Kingdom

Start date:
04/11/2017

Completion date:
07/12/2017

Update:

Footway closure on a section of Upper Ground next to Bernie Spain Gardens as a result of utilities work by Virgin Media below pavement level.

Lane Closure | Waterloo Road

Address:
110-111 A301, Lambeth, London SE1 8SG, UK

Start date:
02/02/2017

Completion date:
02/02/2017

Update:

Virgin Media will be carrying out works and need access to the chambers in the carriageway. There will be a lane closure as a result.