Lane Closure | Mepham Street

Address:
3 Mepham St, Lambeth, London SE1 8FS, UK

Start date:
29/08/2017

Completion date:
30/08/2017

Update:

There will be a lane closure on Mepham Street between 29th and 30th August 2017.

Traffic Management | Chicheley Street 12 Week Programme

Address:
4-5 Chicheley St, Lambeth, London SE1, UK

Start date:
03/08/2017

Completion date:
17/11/2017

Update:

There will be traffic management in place for 12 weeks from the 1st September on Chicheley Street as part of the Southbank Place development.

There will be no lane closures, however the width of the lanes will be reduced to make way for a multi-utility trench which will connect all utilities for the development.

Two way traffic will be maintained throughout the 12 weeks. Works will take place Monday – Friday between 08:00 and 17:00 until 17th November.

The bus stop on Chicheley Street will temporarily suspended for the duration.

Road Closure | York Road

Address:
75-79 York Rd, Lambeth, London SE1 7NJ, UK

Start date:
17/07/2017

Completion date:
29/07/2017

Update:

From 23rd-28th July York Road will be closed to facilitate resurfacing works. The closures will be between 21:00 and 05:00 each night, with the majority of noisy works being completed by 12:00 (midnight). This is part of the ongoing TfL programme for Westminster Bridge Road.

Road Closure | Addington Street

Address:
Park Plaza Westminster Bridge Hotel, 200 Westminster Bridge Rd, Lambeth, London SE1 7UT, UK

Start date:
17/07/2017

Completion date:
29/07/2017

Update:

From 23rd-28th July Addington Street will be closed to facilitate resurfacing works. The closures will be between 21:00 and 05:00 each night, with the majority of noisy works being completed by 12:00 (midnight). This is part of the ongoing TfL programme for Westminster Bridge Road.

Lane Closure | Lambeth Road

Address:
Norfolk Row, Lambeth, London SE1 7JP, UK

Start date:
19/06/2017

Completion date:
27/06/2017

Update:

There will be a lane closure outside number 111 Lambeth road between 19th and 27th June 2017.

York Road Slip Road Closure

Address:
45 A3200, Lambeth, London SE1, UK

Start date:
02/06/2017

Completion date:
25/06/2017

Update:

The bus slip road on York Road will be closed for three weeks from 7th-24th June 2017 as part of the ongoing TfL Westminster Bridge scheme.

The closure is to facilitate the realignment of the curb line, whilst leaving a temporary bus shelter in place. Pedestrians for Westminster Bridge and Park Plaza Hotel will be diverted via Forum Magnum Square and Belvedere Road.

Multi-Way signals | York Road

Address:
1 Mepham St, Lambeth, London SE1 8RL, UK

Start date:
21/05/2017

Completion date:
06/06/2017

Update:

There will be multi-way signals in place on York Road at the junction with Mepham street from 22/05/2017 – 04/06/201.

Lane Closure | Lambeth Road

Address:
150 Lambeth Rd, Lambeth, London SE1 7DF, UK

Start date:
24/04/2017

Completion date:
12/05/2017

Update:

There will be a lane closure on Lambeth Road for a service pipe repair of 33mm in the carriageway. The closure will be from 9th May – 11th May 2017.